Sattva Centralis Specifications
Sattva Centralis specifications cover a 6.5-acre site, three towers of Basement + Ground + 31 floors and approximately 450 apartments in Jigani, South Bengaluru. Detailed specifications will be updated as official information becomes available.
Specifications
Sattva Centralis Specifications & Structure Details
Sattva Centralis specifications cover a high-rise residential development of three towers on approximately 6.5 acres in Jigani, South Bengaluru, built to a Basement + Ground + 31 floor structure and holding around 450 apartments in 1, 2, 3 and 4 BHK configurations.
The detailed Sattva Centralis specification list — flooring, doors and windows, kitchen and bathroom fittings, electrical provisions, lifts and security systems — has not yet been released by the developer. What is confirmed and what is still pending are both set out in full below.
Specification schedules matter more than most buyers realise. Two apartments of identical size and price can differ substantially in the quality of what is actually fitted inside them — and those differences are expensive to change after possession.
It is also the area where pre-launch marketing is least reliable. Specification lists are frequently published before a developer has issued anything, copied from unrelated projects, and then quietly revised. We have chosen not to do that. Below is what is genuinely confirmed, followed by the heads that remain open and the questions worth asking when the schedule is released.
Confirmed
Sattva Centralis Specifications — Confirmed Details
Confirmed Sattva Centralis specifications are the project-level figures: a 6.5-acre site, 3 towers, a Basement + Ground + 31 floor structure, approximately 450 units in 1, 2, 3 and 4 BHK, and six amenities. The full table is below.
| Project Name | Sattva Centralis |
|---|---|
| Developer | Sattva Group |
| Project Type | High-rise residential apartments |
| Location | Jigani, Bommasandra-Jigani Link Road, Anekal, South Bengaluru – 560105 |
| Land Area | Approximately 6.5 acres |
| Number of Towers | 3 |
| Tower Structure | Basement + Ground + 31 floors |
| Total Units | Approximately 450 |
| Configurations | 1, 2, 3 & 4 BHK |
| 1 BHK Size | 650 – 750 sq.ft. (indicative) |
| 2 BHK Size | 1,050 – 1,250 sq.ft. (indicative) |
| 3 BHK Size | 1,450 – 1,700 sq.ft. (indicative) |
| 4 BHK Size | 2,000 – 2,900+ sq.ft. (indicative) |
| Confirmed Amenities | Multi-tier clubhouse, temperature-controlled swimming pool, gymnasium, mini theatre, sports courts, landscaped gardens |
| Basement | Planned for parking and building services |
| Project Status | Pre-Launch |
| RERA Status | Registration under process — no number issued |
Awaiting Confirmation
Sattva Centralis Specification List — Yet to Be Released
The Sattva Centralis specification list covering flooring, doors, windows, kitchen and bathroom fittings, electrical provisions, lifts, paint and security has not been released by Sattva Group. Each item below will be updated once the official schedule is published.
| Structure | To be updated after official confirmation |
|---|---|
| Flooring — Living & Dining | To be updated after official confirmation |
| Flooring — Bedrooms | To be updated after official confirmation |
| Flooring — Kitchen & Utility | To be updated after official confirmation |
| Flooring — Bathrooms | To be updated after official confirmation |
| Flooring — Balconies | To be updated after official confirmation |
| Main Door | To be updated after official confirmation |
| Internal Doors | To be updated after official confirmation |
| Windows | To be updated after official confirmation |
| Kitchen Counter & Fittings | To be updated after official confirmation |
| Bathroom Sanitaryware & CP Fittings | To be updated after official confirmation |
| Electrical Fittings & Switches | To be updated after official confirmation |
| Power Backup | To be updated after official confirmation |
| Lifts — Count & Brand | To be updated after official confirmation |
| Painting — Internal & External | To be updated after official confirmation |
| Water Supply & Treatment | To be updated after official confirmation |
| Security Systems | To be updated after official confirmation |
| Parking Allocation | To be updated after official confirmation |
| Fire Safety Systems | To be updated after official confirmation |
| Sustainability & Green Features | To be updated after official confirmation |
Get the Specification Schedule
Register your interest and the official specifications will be shared as soon as the developer releases them.
Buyer's Guide
What to Ask When Specifications Are Released
When the Sattva Centralis specification schedule is released, ask for brand names rather than categories, check what differs between configurations, establish exactly what is fitted at handover, confirm lift count per tower, and cover power backup, water treatment and fire safety. These questions separate a genuinely detailed specification from a vague one.
Ask for brand names, not categories
"Premium vitrified tiles" and "branded CP fittings" are categories, not specifications. A real schedule names the brand and often the series. Where a document says "or equivalent", ask what the equivalent standard is and who decides it.
Check what differs between configurations
Specifications frequently vary between a 1 BHK and a 4 BHK in the same development — flooring grade, kitchen provisions and bathroom fittings are common points of difference. Ask for the schedule applicable to your configuration specifically.
Establish what is actually included
Modular kitchens, wardrobes, air conditioning, geysers and light fittings are sometimes shown in marketing visuals but not included in the handover. Ask for an explicit list of what is fitted at handover versus what is shown for illustration.
Ask about the lifts
In a 31-floor tower, lift count, capacity and speed determine morning waiting times for the life of the building. Ask how many lifts serve each tower, how many units are on each floor, and whether a service lift is separate.
Cover power, water and safety
Power backup capacity per apartment, water source and treatment provisions, and fire safety systems are the heads buyers ask about least and rely on most. Get them in writing.
Confirm carpet area against the RERA disclosure
Once the project is RERA registered, the carpet area disclosed there is the authoritative figure. Check it against what the sales documentation states.
Stay Informed
Get Specifications When Released
The specification schedule is normally published alongside the official brochure and floor plans at launch, currently expected in November 2026. Register your interest and it will be sent to you as soon as it is available.
Related: Sattva Centralis floor plans, amenities and price details.
Request the Specification Schedule
Receive the official specifications as soon as the developer releases them.
Thank you! Your enquiry has been received.
Our project advisor will contact you shortly.
Specification FAQs
Frequently Asked Questions
Detailed specifications will be updated as official project information becomes available. Sattva Centralis is at pre-launch stage and the developer has not released the specification schedule covering flooring, doors, windows, kitchen and bathroom fittings, electrical provisions or lift brands.
Flooring specifications have not been released. This page will be updated once the developer publishes the official specification schedule.
Sanitaryware, CP fittings and kitchen fitting brands have not been specified by the developer. Rather than list brand names that may be incorrect, we will publish the schedule once it is officially released.
The structure is planned as Basement + Ground + 31 floors across three towers. The detailed structural system, seismic design basis and construction methodology have not been published.
Lift count, capacity and brand have not been confirmed. In a 31-floor tower this is a detail worth confirming directly with the sales team, as it materially affects peak-hour waiting times.
Power backup provisions have not been specified by the developer. Details will be published with the official specification schedule.
Security provisions have not been detailed at pre-launch stage. The confirmed amenity list covers a clubhouse, swimming pool, gymnasium, mini theatre, sports courts and landscaped gardens.
Specifications are normally published by the developer at launch, alongside the official brochure, floor plans and cost sheet. Expected launch is November 2026. Register your interest and the schedule will be shared as soon as it is released.
Because the developer has not released them. Specification lists published before a developer issues them are frequently copied from unrelated projects and turn out to be wrong. We would rather show you an honest gap than an invented list.
Be First to Receive the Specifications
Register your interest and the official specification schedule will be shared as soon as it is released.